NPPs in Japan
Construction resumed on 2012-10-01
Ohma
Reactor Type: | ABWR |
---|---|
Gross Output: | 1383MWe |
Owner: | EPDC |
Operator: | EPDC |
Applications for Restart: | 2014-12-16 |
---|
Construction Start: | 2008-05-27 |
---|---|
Main contractor: | Hitachi GE/Toshiba |
Architect Engineer: | Hitachi GE/Toshiba |
Reactor System supplier: | Hitachi GE |
Reactor Vessel supplier: | Hitachi GE |
Incore Structure supplier: | Hitachi GE |
Fuel supplier: | GNF-J |
Steam raising supplier: | Toshiba |
Turbine generator supplier: | Toshiba |
Civil works: | various |